Create a multilevel work breakdown structure (WBS) and detailed project schedule based upon the information from Appendix 13.2.

  1. Create a multilevel work breakdown structure (WBS) and detailed project schedule based upon the information from Appendix 13.2.

Part B: Written Response

(Submit as a Microsoft Word file)

Write a one to two (1-2) page response in which you:

  1. Summarize the project’s performance in terms of schedule and costs.
  2. Recommend corrective actions (at least two [2] total) to improve the project’s performance.
  3. Give your opinion on what you foresee as the greatest risk to the project.
  4. Format your assignment according to the following formatting requirements: