Research requires some graphs and calculation (primary and secondary settlement of organic soil over short and long term under embankment (train and embankment are the loads on sub-soil).
The research requires some graphs and calculation (primary and secondary settlement of organic soil over short and long term under embankment (train and embankment are the loads on sub-soil). I need a copy of calculation procedure from the writer.
joyce
0