A study of the relationship in between Time, Cost & Quality in construction management

Project description
1. SPSS Statistic software must use to analysis the results from quantitative approach (questionnaires).
2. 30 questions (8 in Time, 8 in Cost, 8 in Quality and 6 in personal questions) in minimum 75 Questionnaires (25 engineers, 25 builders and 25 quantity surveyor)
3. Dissertation format should be according to the attached MBA sample format.
4. SPSS file should provide to me.
———-